JOSEPH F. BELLAND
EAGLE PROJECT
HANDICAP DRIVEWAY & WALKWAY
BILL OF MATERIALS
ITEM | DESCRIPTION | QUANTITY | COST EACH | EXTENDED COST |
FRAMING LUMBER | USED TO LAYOUT CONCRETE DESIGN 2 X 4 | TBD | ||
FRAMING LUMBER | USED TO LAYOUT CONCRETE DESIGN 2 X 6 | TBD | ||
FRAMING NAILS | USED TO FORM THE DESIGN LAYOUT | BOX OF 100 | ||
FRAMING WOOD SPIKES | USED TO FORM THE DESIGN AND SECURE TO GROUND 12 INCHES LONG | 48 | ||
HAMMER | USED TO DRIVE NAILS INTO WOOD | 2 | ||
WHEEL BARROW | USED TO HAUL DIRT AWAY | 2 | ||
SHOVEL | USED TO REMOVE DIRT FROM CONCRETE AREA | 4 | ||
CONCRETE FLOAT | USED TO LAY CONCRETE 16 X 3 1/2 INCHES | 2 | 12.96 | 25.92 |
CEMENT TROWEL | USED TO FINISH CONCRETE 14 X 4 INCHES | 2 | 12.77 | 25.54 |
CONCRETE EDGER | USED TO EDGE CONCRETE | 2 | 9.97 | 19.94 |
BULL FLOAT | USED TO SMOOTH CONCRETE | 1 | 59.96 | 59.96 |
BULL FLOAT HANDLE | USED TO CONNECT TO BULL FLOAT | 2 | 19.99 | 39.98 |
CONCRETE GROVER | USED TO MARK BLOCK OF CONCRETE IMPRESSION LINE | 1 | 9.97 | 9.97 |
CONCRETE LACER HANDLE | USED TO CONNECT TO PLACER HEAD | 1 | 7.44 | 7.44 |
CONCRETE PLACER HEAD | USED TO RAKE CONCRETE | 2 | 11.44 | 22.88 |